top of page

Building Services (BLD60903)

Project 1 - Application of Building Services

INTRODUCTION

 

This is an individual project to apply basic building services systems into semester 2 design project.

 

OBJECTIVES

 

  • To develop students understanding and knowledge of building services systems in design and construction.

  • To apply appropriate building services system and solution for a specific design.

  • To demonstrate a comprehensive understanding of applicability of specific building services systems in the design in response to practical considerations.

  • To develop students’ ability to resolve issues related to specific building services systems.

 

 

LEARNING OUTCOMES

  1. Identify relevant information related to water supply, liquid waste disposal, mechanical air-conditioning, fire safety and vertical transportation system.

  2. Describe the planning of building services within the total design and construction process.

  3. Describe the installation of building services within the total design and construction process.

 

 

SUBMISSION REQUIREMENTS

 

  • Drawings and diagrams are to be presented in a maximum of 2 sheets of A2 size paper which include the following:

Board 1: Hot and cold system ; Sanitary and sewerage sytem with UBBL
Board 2: Draingae system ; Electrical system with UBBL

Project 2 - Case Study and Documentation of Building Services Systems

INTRODUCTION

 

This is a group project to perform a case study on the building services systems installed in a building.

 

OBJECTIVES

 

  • To introduce students to the basic principles, process and equipment of various building services systems through real life project (experiential learning).

  • To expose students to the integration of various building services systems in a building.

  • To allow students to demonstrate their understanding of building services systems

  • To develop students’ understanding and familiarity on the drawing conventions and standards for different

    building services systems

 

 LEARNING OUTCOMES

 

  1. Identify and understand relevant information related to mechanical ventilation, air-conditioning, and mechanical transportation system as well as fire protection systems.

  2. Understand how each building services functions including the connections and position of different parts equipment.

  3. Understand and explain the principles and systems as well as space implications and regulations related to different building services.

 

 SUBMISSION REQUIREMENTS

 

  • An A4 bound report, both in softcopy and hardcopy

Group Report for Subang Parade
  • Wix Facebook page
  • Wix Twitter page
  • Wix Google+ page
bottom of page